Flowline Removal Complete: Mary Miller 2-35
The Town of Erie received confirmation from COGCC that the flowline serving the MARY MILLER 2-35 well (API #05-013-06273) was removed in its entirety on 09/03/2021.
Approximately 1260' of 2" steel pipeline (buried +/- 3' deep) was removed, the potholes were backfilled and the land surface was graded. The flowline was located outside of Erie limits, south of Arapahoe Road and west of 119
th Street.
MoreVisit the Town of Erie interactive Oil and Gas Sites map (most compatible on a desktop)Questions and comments can be sent to erieoilandgas@erieco.govView archive of Oil and Gas notifications