Radon Mitigation System Installation

  1. Submittal requirements
  2. Required Inspections
  3. Helpful Information 
  1. Completed application
  2. Design information to include:
    • type of fan
    • proposed location of fan
    • if sump pit is being utlized
    • other pertinent design information
  3. Contractors must secure a Town of Erie contractor's license (including submitting proof of being bonded and insured as required).